External Wall Insulation (EWI) System Failure Investigations
EWI System Failure Investigations
Solid wall and external wall insulation systems have been a popular choice to improve the energy efficiency of buildings for a number of years now but did you know they are failing at an alarming rate?
Malone Associates Ltd have been predicting for a number of years that we would see a high rate of EWI system failures and we are confident that our prediction has proved to be correct. We are published experts in EWI systems so please read ‘The Risky Business of Covering Up’, which is available Here
We have reviewed a number of systems failures in high rise blocks and have consistently found problems relating to inadequate design, poor installation standards, poor management and storage of site materials and poor detailing around windows and other junction details, so that in effect, the defects are being built in.
We are a leading UK expert in these system failures and can carry out a comprehensive investigation and provide documentary evidence as to the cause of your system failure. Our investigation & report will determine whether the system has been poorly designed, poorly managed & installed or poorly maintained.

What you can expect from an EWI Failure Investigation.
- A thorough desktop review of the building construction type, the EWI system, the system component parts and a check to ensure it meets BBA approval.
- A review of any additional reports provided by the system manufacturers or installers.
- A detailed review of the design process.
- A thermal imaging survey to help pinpoint areas of failure.
- An initial internal investigation of any damp areas to establish whether the cause is penetrating damp and to carry out an initial visual external assessment to easily accessible areas and to collect photographic evidence for further desktop review.
- An assessment of all supplementary factors such as windows, wall fixings, external vents, parapet wall details, sealants etc.
- A detailed invasive site investigation focussed to specific areas as directed from initial survey work. This will involve opening up the render system to assess the severity of failure and the cause.
- Finally, we will provide a detailed written report that includes a photographic defect schedule of our findings, our conclusions as to the cause and responsibility for failure, and detailed recommendations.





